MCG is commencing the upgrade and bitumen sealing works for the Millennium/Poitrel access road.
The road is approximately 10km long with drainage, paving and bitumen sealing of the entire length required. MCG proposed a realignment of the jump up to create a safer road profile. This option was accepted and working together with BMA, MCG constructed this realignment to the new profile.