Client:
Isaac Plains Coal Management
Scope:
Dragline crossing.
Location:
Moranbah, QLD
Project Features:
The dragline crossing location was of significant cultural significance and required the presence of cultural monitors while topsoil stripping and clearing operations were carried out. The nature of some of the finds meant that alterations were made to the design of some dump areas with MCG adjusting its operations to suit these changes. The crossing required installation of a 3 barrel CSP crossing with concrete and rock protection works for scour protection.
Return to MCG Civil Projects
|